| |
Construction Photos - Week of 11/20/09
View to south into Filter No. 7 after CDF placement
View to south into Filter No. 7 after CDF placement
View of Quad C from the NW corner
View of Quad C from the SW corner
View of Filter No. 1 (wall pour #4) from the SW corner
Panoramic view from east to north at riprap channel inlet (1 of 3)
Panoramic view from east to north at riprap channel inlet (2 of 3)
Panoramic view from east to north at riprap channel inlet (3 of 3)
View at the top of the riprap channel
View of riprap channel inlet
Upper rebar for Filter No. 1 east wall
Blankets used to heat wall pour #4 overnight
Ground source heat coils used to heat wall pour #4 forms overnight
Upper rebar for Filter No. 1 west wall
North wall of the south filters in Quad C
Stresscon rebar set up area
View of south filters from the SW corner
Looking at the finish on the west wall of Filter No. 1
View of interior wall pour in Filter No. 7
View of construction from the SW corner of excavation
View of the drainage swale on the west end of the 3:1 slope excavation
Ground thaw heaters for Filter No. 5 upper slab pour
View of hydrophilic waterstop for Filter No. 5 upper slab pour
View of hydrophilic waterstop for Filter No. 5 upper slab pour
Thumbnail panels:
|
|
|