Construction Photos - Week of 10/30/09

  • Image
    South wall of Filters No. 5 and 6
  • Image
    View to the west inside Filter No. 4
  • Image
    View of wall reinforcement at the Filter No. 2 interior corner
  • Image
    View of the Filter No. 2 pipe penetration reinforcement
  • Image
    View to the east inside Filter No. 2
  • Image
    30" RW 45 degree bend at sta 19+20± (second 45 degree bend)
  • Image
    30" RW 45 degree bend at sta 19+20± (second 45 degree bend)
  • Image
    30" RW pipeline 22-1/2 degree bend at sta 21+80±
  • Image
    30" RW pipeline 22-1/2 degree bend at sta 21+80± with concrete thrust block