| |
Construction Photos - Week of 08/07/09
Thunderstorm moving through the site in the morning
Thunderstorm moving through the site in the morning
Articulated dump truck being shipped from site
Quad "C" first lift of structural fill
Panoramic view of waste area from north to east at NW fence corner (1 of 4)
Panoramic view of waste area from north to east at NW fence corner (2 of 4)
Panoramic view of waste area from north to east at NW fence corner (3 of 4)
Panoramic view of waste area from north to east at NW fence corner (4 of 4)
Panoramic view of site from east to west (1 of 4)
Panoramic view of site from east to west (2 of 4)
Panoramic view of site from east to west (3 of 4)
Panoramic view of site from east to west (4 of 4)
View of Main Treatment Building pit
View of Quad "C" pit and first lift of structural fill
View of staging area east of the pre-oxidation pad
Panoramic view of site from west to east from the pre-oxidation pad (1 of 4)
Panoramic view of site from west to east from the pre-oxidation pad (2 of 4)
Panoramic view of site from west to east from the pre-oxidation pad (3 of 4)
Panoramic view of site from west to east from the pre-oxidation pad (4 of 4)
View of concrete batching equipment west of the job trailers
View of concrete batching equipment west of the job trailers
View of the job trailers
View to the east along the south side of the job trailers
View of the water storage tank
Straw wattles placed on the drainage ditch south of the project entrance
Erosion control silt fence along the east / west drainage ditch south of the site
Straw wattles placed on the drainage ditch north of the project entrance
Panoramic view from north to west looking at the waste area (1 of 4)
Panoramic view from north to west looking at the waste area (2 of 4)
Panoramic view from north to west looking at the waste area (3 of 4)
Panoramic view from north to west looking at the waste area (4 of 4)
View of the site
Thumbnail panels:
|
|
|