Construction Photos - Week of 04/23/10

  • Image
    Waste drain piping under Quad "A"
  • Image
    Waste drain piping under Quad "A"
  • Image
    Waste drain piping under Quad "A"
  • Image
    Waste drain piping under Quad "A"
  • Image
    Interior west wall of Filter #1
  • Image
    Excavation for the Chemical Spill Vault
  • Image
    Mixer and pump truck during placement of flowable fill in Filter #1
  • Image
    View to the east from on top of filters, looking at crews assembling gang forms
  • Image
    Flowable fill placement in Filter #1
  • Image
    Interior of Filter #2
  • Image
    Interior of Filter #2
  • Image
    Drain waste piping under Quad "A"
  • Image
    Waste drain piping under Quad "A"
  • Image
    Waste drain piping under Quad "A"
  • Image
    Waste drain piping under Quad "A"
  • Image
    Waste drain piping under Quad "A"
  • Image
    Waste drain piping under Quad "A"
  • Image
    Flowable fill placement in Filter #2
  • Image
    42" RW at NW corner of Quad "D"
  • Image
    Forms flew out on riser pipe encasement of Quad "D"
  • Image
    Elevator base slab
  • Image
    View to the west of the BWW channel on the north end of Filters #3 and #4
  • Image
    View to the east of BWW channel on north end of Filters #3 and #4
  • Image
    View to the west of Chemical Spill Vault foundation
  • Image
    View of wall sleeves in the south Quad "A" stem wall
  • Image
    View of wall sleeves in the south Quad "A" stem wall
Thumbnail panels:
Now Loading

 

 
Home
Water Treatment Plant Phase 1 Construction:   Construction Photos     Daily Construction Logs
Water Treatment Plant Phase 2 Construction:   Construction Photos     Daily Construction Logs
Lagoon:   Construction Photos     Daily Construction Logs