Construction Photos - Week of 04/04/10
Crew tightening bolts on 42" TW pipeline to be encased in Quad "D"
Concrete encasement of 36" TW pipeline in Quad "D"
Concrete encasement of 36" TW pipeline in Quad "D"
Concrete encasement of 48" / 42" RW pipeline at the NW corner of Quad "D"
Rebar dowels requiring corrective action in BWW channel wells
Rebar dowels requiring corrective action in BWW channel wells
Rebar dowels requiring corrective action in BWW channel wells
View to the east from SW corner of the site
View of Main Treatment Building from SW corner of site
Quad "C" reinforcement for the Filter Effluent Diversion structure
Quad "C" future pump station north wall
Quad "C" future pump station north wall
North Quad "D" footer wall
Quad "C" stair support wall between Filter No. 8 and the future Effluent Pump Station
Quad "C" stair support wall between Filter No. 8 and the future Effluent Pump Station
North Quad "D" footer wall
Quad "C" Filter Effluent Flow Diversion structure south interior wall rebar
42" / 48" RW spool encased at the NW corner of Quad "D"
Encased steel pipe touch-up coating, Tnemec Hi-Build Tneme-Tar
42" TW encased flange after field coating with coat-tar epoxy
6" SSL pipe 90º bend in Quad "D"
6" SSL pipeline in Quad "D"
4" MSR stainless steel pipes for Sedimentation Basin
Upper BWW channel wall in Quad "C"
RSCI pipe superintendent Andy Mehlin and foreman Paul Plorde during pressure test
BWW block outs in north filter walls
Close-up view of concrete in north filters requiring patch work repairs
Double hydrophilic waterstop in Quad "D" north wall construction joint
South end of 42" TW pipe encasement in Quad "D"
View of Quad "D" from NW corner
8" SSL pipelines from Quad "D" sand recirculation box heading south
8" SSL pipelines from Quad "D" sand recirculation box heading south
Quad "C" wall pour on future Effluent Pump Station walls
Adding rebar during future Effluent Pump Station pour
Adding rebar during future Effluent Pump Station pour
Adding rebar during future Effluent Pump Station pour
Hooks in walls at SE corner of Quad "C"
48" RW pipe at NW corner of Quad "D"
Quad "A" backfill progress
Encasement of Quad "D" 8" SSL pipes
Thumbnail panels:
|
|
|