Construction Photos - Week of 04/04/10

  • Image
    Crew tightening bolts on 42" TW pipeline to be encased in Quad "D"
  • Image
    Concrete encasement of 36" TW pipeline in Quad "D"
  • Image
    Concrete encasement of 36" TW pipeline in Quad "D"
  • Image
    Concrete encasement of 48" / 42" RW pipeline at the NW corner of Quad "D"
  • Image
    Rebar dowels requiring corrective action in BWW channel wells
  • Image
    Rebar dowels requiring corrective action in BWW channel wells
  • Image
    Rebar dowels requiring corrective action in BWW channel wells
  • Image
    View to the east from SW corner of the site
  • Image
    View of Main Treatment Building from SW corner of site
  • Image
    Quad "C" reinforcement for the Filter Effluent Diversion structure
  • Image
    Quad "C" future pump station north wall
  • Image
    Quad "C" future pump station north wall
  • Image
    North Quad "D" footer wall
  • Image
    Quad "C" stair support wall between Filter No. 8 and the future Effluent Pump Station
  • Image
    Quad "C" stair support wall between Filter No. 8 and the future Effluent Pump Station
  • Image
    North Quad "D" footer wall
  • Image
    Quad "C" Filter Effluent Flow Diversion structure south interior wall rebar
  • Image
    42" / 48" RW spool encased at the NW corner of Quad "D"
  • Image
    Encased steel pipe touch-up coating, Tnemec Hi-Build Tneme-Tar
  • Image
    42" TW encased flange after field coating with coat-tar epoxy
  • Image
    6" SSL pipe 90º bend in Quad "D"
  • Image
    6" SSL pipeline in Quad "D"
  • Image
    4" MSR stainless steel pipes for Sedimentation Basin
  • Image
    Upper BWW channel wall in Quad "C"
  • Image
    RSCI pipe superintendent Andy Mehlin and foreman Paul Plorde during pressure test
  • Image
    BWW block outs in north filter walls
  • Image
    Close-up view of concrete in north filters requiring patch work repairs
  • Image
    Double hydrophilic waterstop in Quad "D" north wall construction joint
  • Image
    South end of 42" TW pipe encasement in Quad "D"
  • Image
    View of Quad "D" from NW corner
  • Image
    8" SSL pipelines from Quad "D" sand recirculation box heading south
  • Image
    8" SSL pipelines from Quad "D" sand recirculation box heading south
  • Image
    Quad "C" wall pour on future Effluent Pump Station walls
  • Image
    Adding rebar during future Effluent Pump Station pour
  • Image
    Adding rebar during future Effluent Pump Station pour
  • Image
    Adding rebar during future Effluent Pump Station pour
  • Image
    Hooks in walls at SE corner of Quad "C"
  • Image
    48" RW pipe at NW corner of Quad "D"
  • Image
    Quad "A" backfill progress
  • Image
    Encasement of Quad "D" 8" SSL pipes
Thumbnail panels:
Now Loading

 

 
Home
Water Treatment Plant Phase 1 Construction:   Construction Photos     Daily Construction Logs
Water Treatment Plant Phase 2 Construction:   Construction Photos     Daily Construction Logs
Lagoon:   Construction Photos     Daily Construction Logs