Construction Photos - Week of 03/26/10
Microsand Recirculation Pump Slab in Quad D
Microsand Recirculation Pump Slab in Quad D
Rerouted hub & floor drain location due to manufacturer pipe layout change
Exposed 48" Pipeline at the Contact Basin
Exposed 48" Pipeline at the Contact Basin
Concrete placement on the Quad D Microsand Recirculation Pump Area Slab
North Quad D foundation wall footer
36" TW pipes from the flow splitter boxes to the coagulation tanks
36" TW pipes from the flow splitter boxes to the coagulation tanks
42/48" RW Pipeline as it enters Quad D in the northwest corner
Overview of pipe laid to date in Quad D
View of construction from Quad A southwest corner
Quad D pipe encasements
View of north wall in Quad C
View of north wall in Quad C
View of east wall in Quad C
View of SE wall in Quad C
View of SW filter wall in Quad C
Rubber liner pad installed to protect pipeline coating
Rubber liner pad installed to protect pipeline coating
Pipe brackets and encasement rebar
Rubber liner pad installed to protect pipeline coating
30" RW Pipeline bends @ Sta 23+49 to have thrust block placed
East 1/2 of the north Quad C filter conveyance channel lower level slab
West 1/2 of the south Quad C filter conveyance channel lower level walls
Setting the 42" TW spool in Quad D
36" TW Pipeline lower 1/2 encasement
42/48" RW Pipeline lower 1/2 encasement
42" / 48" RW pipe at the NW corner of Quad B
Overview of site panning from east to west
Overview of site panning from east to west
Overview of site panning from east to west
Overview of site panning from east to west
Overview of site panning from east to west
Overview of site panning from east to west
Filter conveyance channel covered after concrete placement
24" BWS Pipe Spool for Quad C Filter Gallery delivered to site
42" TW joint in the encased portion of the pipe to the splitter structure
42" TW pipe between the southwest corner of Quad C and the splitter structure
Quad A backfill covered due to cold weather