Construction Photos - Week of 03/26/10

  • Image
    Microsand Recirculation Pump Slab in Quad D
  • Image
    Microsand Recirculation Pump Slab in Quad D
  • Image
    Rerouted hub & floor drain location due to manufacturer pipe layout change
  • Image
    Exposed 48" Pipeline at the Contact Basin
  • Image
    Exposed 48" Pipeline at the Contact Basin
  • Image
    Concrete placement on the Quad D Microsand Recirculation Pump Area Slab
  • Image
    North Quad D foundation wall footer
  • Image
    36" TW pipes from the flow splitter boxes to the coagulation tanks
  • Image
    36" TW pipes from the flow splitter boxes to the coagulation tanks
  • Image
    42/48" RW Pipeline as it enters Quad D in the northwest corner
  • Image
    Overview of pipe laid to date in Quad D
  • Image
    View of construction from Quad A southwest corner
  • Image
    View of construction from Quad A southwest corner
  • Image
    42/48" RW Pipeline as it enters Quad D in the northwest corner
  • Image
    Quad D pipe encasements
  • Image
    Quad A backfill
  • Image
    Quad D pipe encasements
  • Image
    View of north wall in Quad C
  • Image
    View of north wall in Quad C
  • Image
    View of east wall in Quad C
  • Image
    View of SE wall in Quad C
  • Image
    View of SW filter wall in Quad C
  • Image
    Rubber liner pad installed to protect pipeline coating
  • Image
    Rubber liner pad installed to protect pipeline coating
  • Image
    Quad D construction
  • Image
    Quad D construction
  • Image
    North footer stub wall in Quad D
  • Image
    Crew cleaning rebar in north footer stub wall in Quad D
  • Image
    Pipe brackets and encasement rebar
  • Image
    Rubber liner pad installed to protect pipeline coating
  • Image
    30" RW Pipeline bends @ Sta 23+49 to have thrust block placed
  • Image
    East 1/2 of the north Quad C filter conveyance channel lower level slab
  • Image
    West 1/2 of the south Quad C filter conveyance channel lower level walls
  • Image
    Setting the 42" TW spool in Quad D
  • Image
    36" TW Pipeline lower 1/2 encasement
  • Image
    42/48" RW Pipeline lower 1/2 encasement
  • Image
    42" / 48" RW pipe at the NW corner of Quad B
  • Image
    Overview of site panning from east to west
  • Image
    Overview of site panning from east to west
  • Image
    Overview of site panning from east to west
  • Image
    Overview of site panning from east to west
  • Image
    Overview of site panning from east to west
  • Image
    Overview of site panning from east to west
  • Image
    Filter conveyance channel covered after concrete placement
  • Image
    24" BWS Pipe Spool for Quad C Filter Gallery delivered to site
  • Image
    42" TW joint in the encased portion of the pipe to the splitter structure
  • Image
    42" TW pipe between the southwest corner of Quad C and the splitter structure
  • Image
    Quad A backfill covered due to cold weather
  • Image
    North Quad D footer wall waterstop at Maturation Tank East wall area
  • Image
    Crews tightening the 42" TW bolts that will be encased
Thumbnail panels:
Now Loading

 

 
Home
Water Treatment Plant Phase 1 Construction:   Construction Photos     Daily Construction Logs
Water Treatment Plant Phase 2 Construction:   Construction Photos     Daily Construction Logs
Lagoon:   Construction Photos     Daily Construction Logs