Construction Photos - Week of 03/19/10

  • Image
    Quad "D" Microsand Pump area encased drain piping
  • Image
    Quad "D" Microsand Pump area encased drain piping
  • Image
    Quad "D" Microsand Pump area encased drain piping
  • Image
    Quad "D" Microsand Pump area encased drain piping
  • Image
    Filter No. 8 east wall intersection with north wall. View from outside the filter
  • Image
    View of north Quad "C" wall west of Filter No. 8
  • Image
    Exterior view of Filter No. 8 east wall
  • Image
    Exterior view of Filter No. 8 east wall
  • Image
    Concrete pads to support pipe brackets for encased pipelines
  • Image
    Concrete pads to support pipe brackets for encased pipelines
  • Image
    Panoramic view from east to north of Quad "C" NE walls (1 of 3)
  • Image
    Panoramic view from east to north of Quad "C" NE walls (2 of 3)
  • Image
    Panoramic view from east to north of Quad "C" NE walls (3 of 3)
  • Image
    Backfill along the north wall between Quad "C" and Quad "D"
  • Image
    30" RW pipeline north of the Pre-Ox pad
  • Image
    30" RW pipeline north of the Pre-Ox pad
  • Image
    View of Quad "D" from the Pre-Ox pad
  • Image
    View of Quad "C" from the Pre-Ox pad
  • Image
    Setting the 42" / 48" RW pipe spool at the NW corner of Quad "D"
Thumbnail panels:
Now Loading

 

 
Home
Water Treatment Plant Phase 1 Construction:   Construction Photos     Daily Construction Logs
Water Treatment Plant Phase 2 Construction:   Construction Photos     Daily Construction Logs
Lagoon:   Construction Photos     Daily Construction Logs