Construction Photos - Week of 02/19/10

  • Image
    Forming the interior walls for the future filtered Effluent Pump Station
  • Image
    Forming the interior south and SE interior walls for the Effluent Pump Station
  • Image
    South end interior south wall for the Effluent Pump Station
  • Image
    Working on the leak in the middle area of the filter #5, west wall
  • Image
    Working on leaking west wall of the filter #5
  • Image
    Working on leaking west wall of the filter #5
  • Image
    Working on the south wall of the future filter Effluent Pump Station
  • Image
    Repairing leak in the west side of the wall in filter #5
  • Image
    Looking at the SE corner area of the future filter Effluent Pump Station
  • Image
    Forming the east wall and south wall of the future Effluent Pump Station
  • Image
    Installing the water stop in the south wall, north section of future filtered Effluent Pump Station
  • Image
    Looking down on the south end east wall sections of the future filtered Effluent Pump Station
  • Image
    Installing 48" piping thru the east walls, SE corner for filter Effluent Piping
  • Image
    48" filter Effluent piping in SE corner of SE wall
  • Image
    Looking SE into south corner of the piping going east (48" FE, capped 30" FE piping and 42" FE piping)
  • Image
    Looking at south piping in SE corner of FE piping area
  • Image
    All the piping in east wall of the FE piping, SE corner
  • Image
    Installing the tarps for heating the walls area on the SE corner of the FE piping
  • Image
    Contractor working on heating the ground and patching leaks in the walls where the Quad "D" work goes, west end and north area
  • Image
    Getting ready to finish installing the SE wall going north for enclosure
  • Image
    Setting the last forms for the east side of the filter Effluent piping
  • Image
    Checking for leaks on the west wall of filter #5
  • Image
    Contractor receiving piping for various locations on project site
  • Image
    Contractor receiving piping for various locations on project site
  • Image
    Contractor receiving piping for various locations on project site
  • Image
    Checking for leaks on the NW corner of Filter #5 wall
  • Image
    Doing finishing work on the SE corner of the future filtered Effluent Pump Station
  • Image
    Doing finishing work on the SE corner east wall for the future filtered Effluent Pump Station
Thumbnail panels:
Now Loading

 

 
Home
Water Treatment Plant Phase 1 Construction:   Construction Photos     Daily Construction Logs
Water Treatment Plant Phase 2 Construction:   Construction Photos     Daily Construction Logs
Lagoon:   Construction Photos     Daily Construction Logs