Construction Photos - Week of 01/29/10
Working on walls in the areas of filters #1 thru #4 (01/26/10)
East end of the filters and other work on the ends of future filters #8 and #4 (#8 covered still) (01/26/10)
Contractor working on setting the walls for future filter, east of filter #4 (01/26/10)
Removing forms from walls on the south side of filter #7 (01/26/10)
Forming for the future filter in the SE corner (#4+) (01/26/10)
Hole in wall of filter #7 during a pour. Needs to be fixed (01/26/10)
Another hole thru the wall of filter #7, south wall where the holes are located (01/26/10)
A formed wall being redone on the south wall of filter #7, note: area still has to be checked for leaks after patching. (01/26/10)
Removing the blankets from the NE corner and east wall of filter #8 (future wall) (01/27/10)
Contractor starting to remove the blanket of off the NE corner of filter #8 (future) (01/27/10)
Contractor working on tying rebar mats on the NE corner of future (#4A) wall (01/27/10)
Tying rebar mats on the south and east side filter (#4A) (01/28/10)
Tying rebar mats for the future (#4A) filters on east end of the filters (01/28/10)
Working on cat walks for forming the floor sections of openings in the walls (01/28/10)
East side of the filter (future #4A) being covered by blankets (01/28/10)
Iron workers are finishing tying rebar mats on the SE corner of the future filter #4A (01/28/10)