Construction Photos - Week of 01/22/10
Looking east along the north side of filters No. 8, getting ready to pour walls
East side of the quadrant walls 4 & 8 getting ready to pour filter #8 to the right
NE corner of filter 8 (future), ready to pour
Looking down in the forms for the walls on filter #8
The water stop for the walls in the north side of filter #8
Rebar chamber and chamber along the top of the walls
Area where the walls tie together on the NE corner of filter #8
Looking down the forms inside the heated wall areas on filter #8
Adding additional support on the forms
Heater inside the wall areas for the pour
Getting equipment set up on the north side of the filter #8 walls
Looking west to east along the north side of filter #8 walls
Along the north side of filter #8
Testing lab on site checking slump for the walls at starting of the pour
Contractor pouring the east wall of filter #8 going north to the south
Checking pour going down inside the forms for filter #8
Contractors pumper truck broke down and contractor is having to use bucks to keep everything going
The bucket brigade for keeping the pour going until another pumper truck gets onsite
Another pumper truck on site
Contractor stripping forms on the SE corner of filter basin #4
Contractor working on stripping forms on the SE corner of filter basin #4
Contractor working on removing the forms on the south side of filter basin #4
Removing wood forms from inside the filter basin #4
Blankets over the top of the forms on filter basin #8, looking south to north
Inside the blankets on the top of the forms on the east side of filter basin #8
Looking down inside the filter basin #8, on the west side of the east wall
Looking to the east on the north side of the wall for filter basin #8
Looking at the west end of the north wall of filter basin #8