Construction Photos - Week of 01/22/10

  • Image
    Looking east along the north side of filters No. 8, getting ready to pour walls
  • Image
    East side of the quadrant walls 4 & 8 getting ready to pour filter #8 to the right
  • Image
    NE corner of filter 8 (future), ready to pour
  • Image
    Looking down in the forms for the walls on filter #8
  • Image
    The water stop for the walls in the north side of filter #8
  • Image
    Rebar chamber and chamber along the top of the walls
  • Image
    Area where the walls tie together on the NE corner of filter #8
  • Image
    Looking down the forms inside the heated wall areas on filter #8
  • Image
    Adding additional support on the forms
  • Image
    Heater inside the wall areas for the pour
  • Image
    Getting equipment set up on the north side of the filter #8 walls
  • Image
    Looking west to east along the north side of filter #8 walls
  • Image
    Along the north side of filter #8
  • Image
    Testing lab on site checking slump for the walls at starting of the pour
  • Image
    Contractor pouring the east wall of filter #8 going north to the south
  • Image
    Checking pour going down inside the forms for filter #8
  • Image
    Contractors pumper truck broke down and contractor is having to use bucks to keep everything going
  • Image
    The bucket brigade for keeping the pour going until another pumper truck gets onsite
  • Image
    Another pumper truck on site
  • Image
    Contractor stripping forms on the SE corner of filter basin #4
  • Image
    Contractor working on stripping forms on the SE corner of filter basin #4
  • Image
    Contractor working on removing the forms on the south side of filter basin #4
  • Image
    Removing wood forms from inside the filter basin #4
  • Image
    Blankets over the top of the forms on filter basin #8, looking south to north
  • Image
    Inside the blankets on the top of the forms on the east side of filter basin #8
  • Image
    Looking down inside the filter basin #8, on the west side of the east wall
  • Image
    Looking to the east on the north side of the wall for filter basin #8
  • Image
    Looking at the west end of the north wall of filter basin #8
  • Image
    Looking down inside the west side of the east wall on filter basin #8
Thumbnail panels:
Now Loading

 

 
Home
Water Treatment Plant Phase 1 Construction:   Construction Photos     Daily Construction Logs
Water Treatment Plant Phase 2 Construction:   Construction Photos     Daily Construction Logs
Lagoon:   Construction Photos     Daily Construction Logs