Construction Photos - Week of 01/15/10
Southeast side of the Quad C on the main Treatment Building
Northeast side of the Quad C on the main Treatment Building
The portable on site concrete batching plant
Forming the east side of the filter #4 inside the fabric cover
Looking north to south on the east end of filter #4
Looking at the top filter #4 getting ready to start heating everything for the pour
Getting the pumper ready to do the pour on the east side of filter #4
Plug on the piping sleeve on the north side of the filters chambers layout
Plug on the piping sleeve on the north side of the filters chambers layout
Getting the pumper truck ready to start pumping
Working on the pump truck to get it ready for the pour
The east side end of the filter areas looking east to west
Testing lab getting ready to start testing
Getting ready to start pumping in the filter chamber areas
Pouring the filter chamber layout south side
Pouring the filter chamber between north and south filter walls
Looking north to the NE corner of filter #8
Getting ready to start pouring on the south and east end of filter #4
Looking north along the east end of basin #4
SE corner of filter basin #4
Pouring the base in the north side of filter walls
Pumper truck pumping into the SE corner of filter basin #4
Pumper truck pumping in the SE corner of filter #4
Testing lab doing cylinders, air and slump tests and temp
Pouring in the SE corner of filter basin #4
Finishing the top of the filter basin #4
Finish work on the top of the pour for filter basin #4
Checking the outside walls for the filter #4 (east side)