Construction Photos - Week of 01/15/10

  • Image
    Southeast side of the Quad C on the main Treatment Building
  • Image
    Northeast side of the Quad C on the main Treatment Building
  • Image
    The portable on site concrete batching plant
  • Image
    Forming the east side of the filter #4 inside the fabric cover
  • Image
    Looking north to south on the east end of filter #4
  • Image
    Looking at the top filter #4 getting ready to start heating everything for the pour
  • Image
    Getting the pumper ready to do the pour on the east side of filter #4
  • Image
    Plug on the piping sleeve on the north side of the filters chambers layout
  • Image
    Plug on the piping sleeve on the north side of the filters chambers layout
  • Image
    Getting the pumper truck ready to start pumping
  • Image
    Working on the pump truck to get it ready for the pour
  • Image
    The east side end of the filter areas looking east to west
  • Image
    Testing lab getting ready to start testing
  • Image
    Getting ready to start pumping in the filter chamber areas
  • Image
    Pouring the filter chamber layout south side
  • Image
    Pouring the filter chamber between north and south filter walls
  • Image
    Looking north to the NE corner of filter #8
  • Image
    Getting ready to start pouring on the south and east end of filter #4
  • Image
    Looking north along the east end of basin #4
  • Image
    SE corner of filter basin #4
  • Image
    Pouring the base in the north side of filter walls
  • Image
    Pumper truck pumping into the SE corner of filter basin #4
  • Image
    Pumper truck pumping in the SE corner of filter #4
  • Image
    Testing lab doing cylinders, air and slump tests and temp
  • Image
    Pouring in the SE corner of filter basin #4
  • Image
    Finishing the top of the filter basin #4
  • Image
    Finish work on the top of the pour for filter basin #4
  • Image
    Checking the outside walls for the filter #4 (east side)
  • Image
    Covering the pour for filter #4 to keep heat inside the covering
  • Image
    Checking the falls the next day after the pour on filter basin #4
Thumbnail panels:
Now Loading

 

 
Home
Water Treatment Plant Phase 1 Construction:   Construction Photos     Daily Construction Logs
Water Treatment Plant Phase 2 Construction:   Construction Photos     Daily Construction Logs
Lagoon:   Construction Photos     Daily Construction Logs