Construction Photos - Week of 12/12/08
8” NPW and 4” PW piping at the north wall of the Clearwell
Setting the roof joists on top of the Clearwell electrical room wall.
Crews beginning to lay brick veneer at the SE corner of the Clearwell building
View to the west along the south wall of the Clearwell building (1 of 3)
View to the west along the south wall of the Clearwell building (2 of 3)
View to the west along the south wall of the Clearwell building (3 of 3)
View of the Clearwell from the SE corner
View of the fire hydrant by the NW corner of the Clearwell
Looking west along the communication duct trench from the pull box south of the job trailers
Looking west along the communication duct trench south of the job trailers
Looking west along the communication duct trench south of the job trailers
Looking west along the communication duct trench south of the job trailers
Looking east at the communications duct trench from the SW site entrance
Looking west at the brick veneer on the south wall of the Clearwell from the SE corner
View of the Clearwell brick masonry at the SE corner
View of the steel tubing on top of the Clearwell electrical room CMU wall at the NE corner
Looking at the top of the Clearwell electric room wall
Looking at the top of the Clearwell electric room wall
View to the north looking at the Clearwell roof joists
Looking north at the Clearwell roof joists, decking and access hatches
Looking north at the finish water pumps access hatches on the east end of the Clearwell roof
Looking at the roofing installation on the Clearwell
Looking west at the Clearwell roof
Looking west at the Clearwell roof
Looking east at the Clearwell roof
View of the 3:1 ditch excavation north of the Clearwell
Looking at the drainage ditch on the east end of the site
Looking east at the drainfield
View of the BWR
Looking at the drainage ditch from north of the BWR
View of the BWR and Clearwell buildings
Looking at the electrical components on the east wall of the BWR building
View of the south inside the BWR building
View of the shoring and supports inside the BWR Basin
Looking at the cover on the south wall of the Clearwell building
View inside the Clearwell building from the SE corner
View of the west end of the Clearwell
Looking north at the west end of the site