| |
Construction Photos - Week of 12/07/07
Facing east at south half BWR Basin slab concrete placement
Facing north at south half BWR Basin slab concrete placement
Facing NW looking at concrete pump truck and mixer for south half BWR slab pour
Facing south inside tented BWR lower slab
Facing south inside tented BWR lower slab
Facing south inside tented BWR lower slab
Facing south inside tented BWR lower slab
Facing north inside tented BWR lower slab
Facing north inside tented BWR lower slab
Facing south at BWR Basin lower slab, covered and heated
Thumbnail panels:
|
|
|