Construction Photos - Week of 12/05/08
Looking east at the drainfield
View of the manhole at the SW corner of the Contact Basin
Looking east from the NW corner of the Contact Basin
Looking south along the west side of the Contact Basin
View of the 4” PW and 8” NPW pipes on the north side of the Clearwell
View of the 4” PW and 8” NPW pipes on the north side of the Clearwell
View of the 4” PW and 8” NPW pipes on the north side of the Clearwell
Looking north at the 12” Basin drain pipe on the west side of the Contact Basin
View of the 4” PW and 8” NPW piping at the intersection with the 24” BWS pipe
Looking at the 24” backwash supply pipe on the north side of the Clearwell
View of the power duct bank on the east side of the BWR
View of the power duct bank and hand holes on the east side of the BWR
Looking west along the north side of the BWR
Looking at the 24” BWW and 16” FTW pipes on the north side of the BWR
East to west view of the site from on top of the north slope (1 of 11)
East to west view of the site from on top of the north slope (2 of 11)
East to west view of the site from on top of the north slope (3 of 11)
East to west view of the site from on top of the north slope (4 of 11)
East to west view of the site from on top of the north slope (5 of 11)
East to west view of the site from on top of the north slope (6 of 11)
East to west view of the site from on top of the north slope (7 of 11)
East to west view of the site from on top of the north slope (8 of 11)
East to west view of the site from on top of the north slope (9 of 11)
East to west view of the site from on top of the north slope (10 of 11)
East to west view of the site from on top of the north slope (11 of 11)
Looking east at the drainfield fabric
Looking east at the drainfield fabric
Looking east along the north side of the Contact Basin at the 8” NPW and 4” PW pipes
Contractor filling in subgrade in the area where the concrete and screening plants were set up (1 of 3)
Contractor filling in subgrade in the area where the concrete and screening plants were set up (2 of 3)
Contractor filling in subgrade in the area where the concrete and screening plants were set up (3 of 3)
Looking at the Clearwell roof joists on the north CMU wall
Looking at the Clearwell roof joists on the north CMU wall
Looking at the Clearwell roof joists on the north CMU wall
Looking at the Clearwell roof joists on the south CMU wall
Thumbnail panels:
|
|
|