Construction Photos - Week of 12/05/08

  • Image
    Looking east at the drainfield
  • Image
    View of the manhole at the SW corner of the Contact Basin
  • Image
    Looking east from the NW corner of the Contact Basin
  • Image
    Looking south along the west side of the Contact Basin
  • Image
    View of the 4” PW and 8” NPW pipes on the north side of the Clearwell
  • Image
    View of the 4” PW and 8” NPW pipes on the north side of the Clearwell
  • Image
    View of the 4” PW and 8” NPW pipes on the north side of the Clearwell
  • Image
    Looking north at the 12” Basin drain pipe on the west side of the Contact Basin
  • Image
    View of the 4” PW and 8” NPW piping at the intersection with the 24” BWS pipe
  • Image
    Looking at the 24” backwash supply pipe on the north side of the Clearwell
  • Image
    View of the power duct bank on the east side of the BWR
  • Image
    View of the power duct bank and hand holes on the east side of the BWR
  • Image
    Looking west along the north side of the BWR
  • Image
    Looking at the 24” BWW and 16” FTW pipes on the north side of the BWR
  • Image
    East to west view of the site from on top of the north slope (1 of 11)
  • Image
    East to west view of the site from on top of the north slope (2 of 11)
  • Image
    East to west view of the site from on top of the north slope (3 of 11)
  • Image
    East to west view of the site from on top of the north slope (4 of 11)
  • Image
    East to west view of the site from on top of the north slope (5 of 11)
  • Image
    East to west view of the site from on top of the north slope (6 of 11)
  • Image
    East to west view of the site from on top of the north slope (7 of 11)
  • Image
    East to west view of the site from on top of the north slope (8 of 11)
  • Image
    East to west view of the site from on top of the north slope (9 of 11)
  • Image
    East to west view of the site from on top of the north slope (10 of 11)
  • Image
    East to west view of the site from on top of the north slope (11 of 11)
  • Image
    Looking east at the drainfield fabric
  • Image
    Looking east at the drainfield fabric
  • Image
    Looking east along the north side of the Contact Basin at the 8” NPW and 4” PW pipes
  • Image
    Contractor filling in subgrade in the area where the concrete and screening plants were set up (1 of 3)
  • Image
    Contractor filling in subgrade in the area where the concrete and screening plants were set up (2 of 3)
  • Image
    Contractor filling in subgrade in the area where the concrete and screening plants were set up (3 of 3)
  • Image
    Looking at the Clearwell roof joists on the north CMU wall
  • Image
    Looking at the Clearwell roof joists on the north CMU wall
  • Image
    Looking at the Clearwell roof joists on the north CMU wall
  • Image
    Looking at the Clearwell roof joists on the south CMU wall
  • Image
    Looking at the Clearwell roof joists on the south CMU wall
  • Image
    Looking at the Clearwell roof joists on the south CMU wall
Thumbnail panels:
Now Loading

 

 
Home
Water Treatment Plant Phase 1 Construction:   Construction Photos     Daily Construction Logs
Water Treatment Plant Phase 2 Construction:   Construction Photos     Daily Construction Logs
Lagoon:   Construction Photos     Daily Construction Logs