Construction Photos - Week of 11/21/08

  • Image
    View of the subgrade for 24” finished water pipes on the south side of the Clearwell
  • Image
    Looking at electrical hard holes on the east side of the BWR building
  • Image
    View of the drainfield drain rock placement
  • Image
    View of the drainfield drain rock
  • Image
    Looking north along the 1-1/2” sanitary sewer manifold piping and valve vault riser
  • Image
    Looking at the 48” and 36” FE piping on the west Contact Basin wall
  • Image
    View of the south side of the Clearwell
  • Image
    Looking at the 24” finished water pipe installation south of the Clearwell
  • Image
    Looking at the 24” finished water pipe installation south of the Clearwell
  • Image
    View of the tarp and heating of the north Clearwell wall
  • Image
    View of the tarp and heating of the west Clearwell CMU wall
  • Image
    View from the NW corner of the Contact Basin
  • Image
    View from the NW corner of the Contact Basin
  • Image
    Looking at the 24” finished water piping
  • Image
    Looking at the 24” finished water piping
  • Image
    View of the interior piping that arrived on site.
  • Image
    View of the south side of the Contact Basin
  • Image
    Looking west along the south side of the Clearwell and Contact Basin
  • Image
    View of the BWR from the SW corner
  • Image
    View of the east 24” FW pipe from inside the Clearwell Basin
  • Image
    Looking at the backfill of the south Contact Basin wall
  • Image
    Looking at the backfill of the south Clearwell wall
  • Image
    View of the south side of the Contact Basin and Clearwell from the SE corner of the Clearwell
Thumbnail panels:
Now Loading

 

 
Home
Water Treatment Plant Phase 1 Construction:   Construction Photos     Daily Construction Logs
Water Treatment Plant Phase 2 Construction:   Construction Photos     Daily Construction Logs
Lagoon:   Construction Photos     Daily Construction Logs