Construction Photos - Week of 11/21/08
View of the subgrade for 24” finished water pipes on the south side of the Clearwell
Looking at electrical hard holes on the east side of the BWR building
View of the drainfield drain rock placement
View of the drainfield drain rock
Looking north along the 1-1/2” sanitary sewer manifold piping and valve vault riser
Looking at the 48” and 36” FE piping on the west Contact Basin wall
View of the south side of the Clearwell
Looking at the 24” finished water pipe installation south of the Clearwell
Looking at the 24” finished water pipe installation south of the Clearwell
View of the tarp and heating of the north Clearwell wall
View of the tarp and heating of the west Clearwell CMU wall
View from the NW corner of the Contact Basin
View from the NW corner of the Contact Basin
Looking at the 24” finished water piping
Looking at the 24” finished water piping
View of the interior piping that arrived on site.
View of the south side of the Contact Basin
Looking west along the south side of the Clearwell and Contact Basin
View of the BWR from the SW corner
View of the east 24” FW pipe from inside the Clearwell Basin
Looking at the backfill of the south Contact Basin wall
Looking at the backfill of the south Clearwell wall
View of the south side of the Contact Basin and Clearwell from the SE corner of the Clearwell