Construction Photos - Week of 11/14/08

  • Image
    View of the Backwash Recycle Pumps in the lower BWR Pump Room
  • Image
    View of the Backwash Recycle Pumps in the lower BWR Pump Room
  • Image
    View of the Backwash Sludge Pump clearance with the slab
  • Image
    Looking at the Backwash Sludge Pumps in the lower BWR Pump Room
  • Image
    View of the 3:1 slope north of the BWR structure
  • Image
    View of the Clearwell Basin roof from the east wall
  • Image
    View of the west 24” FW pipe in the Clearwell Basin
  • Image
    View of the 4” PW and 8” NPW in the Clearwell Basin
  • Image
    View of the Sluice Gate (G-6-2) in the Clearwell inlet chamber
  • Image
    View of the BWS wall penetration in the Clearwell Basin
  • Image
    View of the BWS wall penetration in the Clearwell Basin
  • Image
    View of the Backflow Preventer (V960)
  • Image
    Looking at the 48” Sluice Gate on the Clearwell Inlet Chamber (G-6-2)
  • Image
    View of the 24” finish water pipe installation from inside the Clearwell Basin
  • Image
    View of the 24” finish water piping 90º bend inside the Clearwell Basin
  • Image
    Looking at the Contact Basin 24” overflow wall penetration
  • Image
    Looking west at backfill along the north BWR wall
  • Image
    Looking easst at backfill along the north BWR wall
  • Image
    Looking at backfill on the west side of the BWR Basin
  • Image
    Looking at backfill on the west side of the BWR Basin
  • Image
    Looking at the backfill on the south side of the BWR
  • Image
    Clockwise view of the Contact Basin walls during the leak test, from the SE corner to the NE corner (1 of 10)
  • Image
    Clockwise view of the Contact Basin walls during the leak test, from the SE corner to the NE corner (2 of 10)
  • Image
    Clockwise view of the Contact Basin walls during the leak test, from the SE corner to the NE corner (3 of 10)
  • Image
    Clockwise view of the Contact Basin walls during the leak test, from the SE corner to the NE corner (4 of 10)
  • Image
    Clockwise view of the Contact Basin walls during the leak test, from the SE corner to the NE corner (5 of 10)
  • Image
    Clockwise view of the Contact Basin walls during the leak test, from the SE corner to the NE corner (6 of 10)
  • Image
    Clockwise view of the Contact Basin walls during the leak test, from the SE corner to the NE corner (7 of 10)
  • Image
    Clockwise view of the Contact Basin walls during the leak test, from the SE corner to the NE corner (8 of 10)
  • Image
    Clockwise view of the Contact Basin walls during the leak test, from the SE corner to the NE corner (9 of 10)
  • Image
    Clockwise view of the Contact Basin walls during the leak test, from the SE corner to the NE corner (10 of 10)
  • Image
    Looking at tarps used to cover the east Clearwell wall
  • Image
    Backfill on the west side of the BWR
  • Image
    Backfill on the south side of the BWR
  • Image
    Installation of the roofing on the BWR building
  • Image
    Applying waterproofing on the south Clearwell wall
  • Image
    View of the roof drain on the BWR building
  • Image
    Hypalon membrane installation on the BWR building roof
  • Image
    Hypalon membrane installation on the BWR building roof
  • Image
    View of the 18” overflow pipe stubout at the SW corner of the BWR Basin
  • Image
    View of the 18” overflow pipe stubout at the SW corner of the BWR Basin
  • Image
    Reinforcement for vent in BWR Basin upper slab
  • Image
    30”x30” access hatch on the east end of the BWR Basin upper slab
  • Image
    4’x6’ access hatch in the SW corner of the BWR Basin upper slab
  • Image
    Reinforcement for vent piping in the BWR Basin upper slab
  • Image
    4’x6’ access hatch on the west end of the BWR Basin upper slab
  • Image
    View of the BWR Basin upper slab during concrete placement
  • Image
    View of the BWR Basin upper slab during concrete placement
  • Image
    View of the BWR Basin upper slab during concrete placement
  • Image
    View of the BWR Basin upper slab during concrete placement
  • Image
    View of the BWR Basin upper slab during concrete placement
  • Image
    Waterproofing on the south Clearwell wall
Thumbnail panels:
Now Loading

 

 
Home
Water Treatment Plant Phase 1 Construction:   Construction Photos     Daily Construction Logs
Water Treatment Plant Phase 2 Construction:   Construction Photos     Daily Construction Logs
Lagoon:   Construction Photos     Daily Construction Logs