Construction Photos - Week of 11/14/08
View of the Backwash Recycle Pumps in the lower BWR Pump Room
View of the Backwash Recycle Pumps in the lower BWR Pump Room
View of the Backwash Sludge Pump clearance with the slab
Looking at the Backwash Sludge Pumps in the lower BWR Pump Room
View of the 3:1 slope north of the BWR structure
View of the Clearwell Basin roof from the east wall
View of the west 24” FW pipe in the Clearwell Basin
View of the 4” PW and 8” NPW in the Clearwell Basin
View of the Sluice Gate (G-6-2) in the Clearwell inlet chamber
View of the BWS wall penetration in the Clearwell Basin
View of the BWS wall penetration in the Clearwell Basin
View of the Backflow Preventer (V960)
Looking at the 48” Sluice Gate on the Clearwell Inlet Chamber (G-6-2)
View of the 24” finish water pipe installation from inside the Clearwell Basin
View of the 24” finish water piping 90º bend inside the Clearwell Basin
Looking at the Contact Basin 24” overflow wall penetration
Looking west at backfill along the north BWR wall
Looking easst at backfill along the north BWR wall
Looking at backfill on the west side of the BWR Basin
Looking at backfill on the west side of the BWR Basin
Looking at the backfill on the south side of the BWR
Clockwise view of the Contact Basin walls during the leak test, from the SE corner to the NE corner (1 of 10)
Clockwise view of the Contact Basin walls during the leak test, from the SE corner to the NE corner (2 of 10)
Clockwise view of the Contact Basin walls during the leak test, from the SE corner to the NE corner (3 of 10)
Clockwise view of the Contact Basin walls during the leak test, from the SE corner to the NE corner (4 of 10)
Clockwise view of the Contact Basin walls during the leak test, from the SE corner to the NE corner (5 of 10)
Clockwise view of the Contact Basin walls during the leak test, from the SE corner to the NE corner (6 of 10)
Clockwise view of the Contact Basin walls during the leak test, from the SE corner to the NE corner (7 of 10)
Clockwise view of the Contact Basin walls during the leak test, from the SE corner to the NE corner (8 of 10)
Clockwise view of the Contact Basin walls during the leak test, from the SE corner to the NE corner (9 of 10)
Clockwise view of the Contact Basin walls during the leak test, from the SE corner to the NE corner (10 of 10)
Looking at tarps used to cover the east Clearwell wall
Backfill on the west side of the BWR
Backfill on the south side of the BWR
Installation of the roofing on the BWR building
Applying waterproofing on the south Clearwell wall
View of the roof drain on the BWR building
Hypalon membrane installation on the BWR building roof
Hypalon membrane installation on the BWR building roof
View of the 18” overflow pipe stubout at the SW corner of the BWR Basin
View of the 18” overflow pipe stubout at the SW corner of the BWR Basin
Reinforcement for vent in BWR Basin upper slab
30”x30” access hatch on the east end of the BWR Basin upper slab
4’x6’ access hatch in the SW corner of the BWR Basin upper slab
Reinforcement for vent piping in the BWR Basin upper slab
4’x6’ access hatch on the west end of the BWR Basin upper slab
View of the BWR Basin upper slab during concrete placement
View of the BWR Basin upper slab during concrete placement
View of the BWR Basin upper slab during concrete placement
View of the BWR Basin upper slab during concrete placement