Construction Photos - Week of 11/02/07

  • Image
    Looking east at Clearwell / Washwater areas
  • Image
    Looking east at Clearwell formed base slab
  • Image
    Looking NE at prep for Washwater’s first concrete pour
  • Image
    Looking north at Washwater formed base slab
  • Image
    Looking west at prep for Washwater concrete pour
  • Image
    Concrete placement crew with MMI RPR prior to pour
  • Image
    Looking east at concrete placement on Washwater’s outer south slab
  • Image
    Looking east at concrete placement on Washwater’s outer south slab
  • Image
    Coarse aggregate stored on site for use in concrete
  • Image
    Metal units made to keep aggregates from freezing
  • Image
    Heating unit installed to keep aggregate from freezing
  • Image
    Facing north at concrete trial operations
  • Image
    Facing north at the concrete pump truck and mixer west of the BWR Basin
  • Image
    Facing NE at BWR Basin
  • Image
    Facing NW at concrete pump truck and mixer west of the BWR Basin
Thumbnail panels:
Now Loading

 

 
Home
Water Treatment Plant Phase 1 Construction:   Construction Photos     Daily Construction Logs
Water Treatment Plant Phase 2 Construction:   Construction Photos     Daily Construction Logs
Lagoon:   Construction Photos     Daily Construction Logs