Construction Photos - Week of 09/26/08
Looking at reinforcement cut around a form tie in the BWR south wall
BWR Pre Sed Basin wall SE corner
BWR Pre Sed south wall mid section
BWR Pre Sed basin south wall east section
Electrical equipment pad in the SE corner of the upper BWR
Pumproom
Looking south at the brick veneer on the east wall of the BWR
Pumproom
Looking north at brick veneer on the east wall of the BWR Pumproom
Looking at the concrete placement on the mid section of the BWR Pre
Sed Basin south wall
Looking at the anchors between the brick veneer and CMU
Looking west along the north side of the BWR Pre Sed Basin
Looking at an abandoned dewatering well in the NE corner of the
BWE Pre Sed
Looking at the NW corner of the BWR Masonry Building
View of the BWR Pre Sed north side from the NE corner
View of the BWR Pre Sed Basin NW corner
Looking at the BWR wall pour #9 from the NW corner