Construction Photos - Week of 08/22/08

  • Image
    View of the south end of the BWR Pump Room top slab from inside the Pump Room
  • Image
    Looking at the rebar mat for the Contact Basin #20
  • Image
    View of the north end of the BWR Pump Room top slab from inside the Pump Room
  • Image
    View of the east half of the clearwell upper slab from the SE corner
  • Image
    View of the east half of the clearwell upper slab from the SE corner
  • Image
    View of the BWR pre sed basin slab from the SE corner of the Clearwell
  • Image
    Looking at the reinforcement in Contact Basin wall #17
  • Image
    View of the north side of the Contact Basin wall #12
  • Image
    View of the south side of the Contact Basin wall #12
  • Image
    View of the backfill on the east side of the BWR Pump Room
  • Image
    Looking north at the compaction of the subgrade for the 6” BSL line
  • Image
    Looking at the 6” BSL and 12” BWR pipe penetrations at the north end of the BWR Pump Room east wall
  • Image
    Looking at the wall penetration and encasement rebar on the 12” BWR in the east wall of the BWR Pump Room
  • Image
    Looking at the 12” BWR piping as it exits the BWR Pump Room east wall
  • Image
    Looking at the 6” BSL and 12” BWR pipe penetrations in the east wall of the BWR Pump Room
  • Image
    View of the BWR pre sed slab pour #1 from on top of the BWR Pump Room
  • Image
    View of the BWR pre sed slab pour #1 from on top of the BWR Pump Room
  • Image
    View of the BWR pre sed slab pour #1 from on top of the BWR Pump Room
  • Image
    Looking south at the BWR pre sed slab pour #1
  • Image
    View of the BWR pre sed slab pour from on top of the BWR Pump Room
Thumbnail panels:
Now Loading

 

 
Home
Water Treatment Plant Phase 1 Construction:   Construction Photos     Daily Construction Logs
Water Treatment Plant Phase 2 Construction:   Construction Photos     Daily Construction Logs
Careers:   Job Openings