Construction Photos - Week of 7/27/07

  • Image
    Looking at gravel surfacing stockpiles
  • Image
    Facing north at wash water pit
  • Image
    Facing south at wash water pit
  • Image
    Facing west at 3:1 slope excavation north of clear well and wash water structures
  • Image
    Facing west at 3:1 slope excavation on hillside north of clear well structure
  • Image
    Facing west at 3:1 hillside excavation
  • Image
    Facing west at site slope excavation
  • Image
    Facing east at 3:1 slope excavation north of clear well pit
  • Image
    Facing south east at site
  • Image
    Facing south at site
  • Image
    Facing south at site
  • Image
    Facing south west at site
  • Image
    Facing south at 3:1 hillside excavation
  • Image
    Facing west at excavation
  • Image
    Facing north at waste area
  • Image
    Facing north west at waste area
  • Image
    Facing north at 3:1 slope and waste area
  • Image
    Facing north east at 3:1 slope excavation
  • Image
    Facing north east at slope excavation
  • Image
    Facing west at sub excavation area on south end of wash water pit (~1.5' below subgrade)
  • Image
    Facing north east at drainfield area to east of wash water pit
  • Image
    Facing east at drainfield area to east of wash water pit
  • Image
    Facing west at sub excavation on south end of wash water pit
  • Image
    Facing east at sub excavation on south end of wash water pit
  • Image
    Structural fill material
  • Image
    First load of rebar (#7 & #11 rebar for lower pump room foundation slab)
  • Image
    Looking at 100kw GenSet
Thumbnail panels:
Now Loading

 

 
Home
Water Treatment Plant Phase 1 Construction:   Construction Photos     Daily Construction Logs
Water Treatment Plant Phase 2 Construction:   Construction Photos     Daily Construction Logs
Lagoon:   Construction Photos     Daily Construction Logs