Construction Photos - Week of 07/11/08
Looking east at the NW corner of the BWR pump room
Looking east at the SW corner of the BWR pump room
Looking south at the east Clearwell upper slab grade beam
Looking at the Contact Basin wall pour #16 from the NE corner
Looking at the Contact Basin NE from the north side of the structure
Looking at the Contact Basin from the NE corner
Looking at the BWR pump room SW corner
Looking at the compaction of backfill on the south side of the BWR pump room
Looking at the compaction of backfill on the north side of the BWR pump room
Looking at the 48” ductile iron pipe sleeve to be placed in the west Contact Basin wall for the filter effluent lines
Looking at the 48” ductile iron pipe sleeve to be placed in the west Contact Basin wall for the filter effluent lines
Looking at the south Contact Basin wall from the SW corner of the structure
Looking at the backfill compaction on the north side of the BWR pump room
Looking at the east side of the BWR pump room
Looking at the south wall of the Contact Basin from the SW corner
Looking NE at the NW corner of the Contact Basin during concrete placement (pour #11)
Looking at the Washwater Recovery Basin slab pad
Looking at the 24” overflow pipe wall sleeve in the west end of the south Contact Basin wall
Looking at the west end of the Contact Basin south wall
Looking at the east end of the Clearwell upper slab decking from the SE corner
Looking at the Clearwell from the SE corner
Looking at the west end of the Contact Basin south wall (pour #15)
Looking north at the electrical conduit in the BWR pump room upper slab
Looking north at the electrical conduit in the BWR pump room upper slab
Looking at the electrical conduit in the BWR pump room slab from the SW corner
Looking at the electrical conduit on the east side of the BWR pump room upper slab
Looking south at the electrical conduit in the BWR pump room upper slab
Looking south along the east end of the BWR upper slab at the electrical conduit
Looking south at the electrical conduit in the BWR pump room upper slab
Looking at the W16x50 beam embeds along the staircase in the BWR upper slab
Thumbnail panels:
|
|
|