Construction Photos - Week of 07/11/08

  • Image
    Looking east at the NW corner of the BWR pump room
  • Image
    Looking east at the SW corner of the BWR pump room
  • Image
    Looking south at the east Clearwell upper slab grade beam
  • Image
    Looking at the Contact Basin wall pour #16 from the NE corner
  • Image
    Looking at the Contact Basin NE from the north side of the structure
  • Image
    Looking at the Contact Basin from the NE corner
  • Image
    Looking at the BWR pump room SW corner
  • Image
    Looking at the compaction of backfill on the south side of the BWR pump room
  • Image
    Looking at the compaction of backfill on the north side of the BWR pump room
  • Image
    Looking at the 48” ductile iron pipe sleeve to be placed in the west Contact Basin wall for the filter effluent lines
  • Image
    Looking at the 48” ductile iron pipe sleeve to be placed in the west Contact Basin wall for the filter effluent lines
  • Image
    Looking at the south Contact Basin wall from the SW corner of the structure
  • Image
    Looking at the backfill compaction on the north side of the BWR pump room
  • Image
    Looking at the east side of the BWR pump room
  • Image
    Looking at the south wall of the Contact Basin from the SW corner
  • Image
    Looking NE at the NW corner of the Contact Basin during concrete placement (pour #11)
  • Image
    Looking at the Washwater Recovery Basin slab pad
  • Image
    Looking at the 24” overflow pipe wall sleeve in the west end of the south Contact Basin wall
  • Image
    Looking at the west end of the Contact Basin south wall
  • Image
    Looking at the east end of the Clearwell upper slab decking from the SE corner
  • Image
    Looking at the Clearwell from the SE corner
  • Image
    Looking at the west end of the Contact Basin south wall (pour #15)
  • Image
    Looking north at the electrical conduit in the BWR pump room upper slab
  • Image
    Looking north at the electrical conduit in the BWR pump room upper slab
  • Image
    Looking at the electrical conduit in the BWR pump room slab from the SW corner
  • Image
    Looking at the electrical conduit on the east side of the BWR pump room upper slab
  • Image
    Looking south at the electrical conduit in the BWR pump room upper slab
  • Image
    Looking south along the east end of the BWR upper slab at the electrical conduit
  • Image
    Looking south at the electrical conduit in the BWR pump room upper slab
  • Image
    Looking at the W16x50 beam embeds along the staircase in the BWR upper slab
  • Image
    Looking south at the west end of the Contact Basin
Thumbnail panels:
Now Loading

 

 
Home
Water Treatment Plant Phase 1 Construction:   Construction Photos     Daily Construction Logs
Water Treatment Plant Phase 2 Construction:   Construction Photos     Daily Construction Logs
Lagoon:   Construction Photos     Daily Construction Logs