Construction Photos - Week of 06/27/08

  • Image
    Looking at the steel beams at the top of the Washwater stairs
  • Image
    Looking at an embed for the steel beam in the Washwater upper slab
  • Image
    Looking at the steel beams at the top of the Washwater stairs
  • Image
    Looking at an embed for the steel beam in the Washwater upper slab
  • Image
    View of the Contact Basin from the SW corner
  • Image
    Looking at the SW corner of the Clearwell structure
  • Image
    View from the SW corner of the Contact Basin during the forming and rebar placement on wall #9
  • Image
    Looking at the blockout in the west Contact Basin wall (pour #9) for the 36-FE pipe and sluice gate
  • Image
    Looking north at the BWR pump room upper slab
  • Image
    Looking south at the BWR pump room upper slab
  • Image
    Looking west at the BWR pump room upper slab form work and rebar in the NW corner
  • Image
    Looking south from the NW corner of the BWR pump room upper slab
  • Image
    Looking at the south half of the Contact Basin west wall (pour #9)
Thumbnail panels:
Now Loading

 

 
Home
Water Treatment Plant Phase 1 Construction:   Construction Photos     Daily Construction Logs
Water Treatment Plant Phase 2 Construction:   Construction Photos     Daily Construction Logs
Lagoon:   Construction Photos     Daily Construction Logs