Construction Photos - Week of 06/26/09
View of Contact Basin from the SW corner
MCC equipment on the north wall of the Clearwell electrical room
East side of the FW pipe line
Chloramine Analyzer on the east Clearwell Wall
Finished Water Pump and pipe line
FW Vertical Turbine Pump
FW pipe line Pressure Reducing Valve
FW pipe line Pressure Reducing Valve Tag
FW pipe field weld test results
FW pipe line magmeter
Chlorine Analyzer in the NW corner of the Clearwell Building
Clearwell Sample Pumps located in the SW corner of the Clearwell Building
Backwash Supply pipe line in the Clearwell Building
Backwash Recycle Water Pumps in the BWR basement
Stairs on the BWR basement north wall
HVAC duct on the east wall of the BWR Building
View to the west from the Contact Basin at the final grading
View to the west from the Contact Basin at the final grading
Concrete surface hardener
Concrete surface hardener
Concrete surface hardener
Temporary electrical controls
View to east at site drainfield
View of the Clearwell Building
View of the site from the stockpile area
View of the site from the stockpile area
View of access road to stockpile area west of the site
Thumbnail panels:
|
|
|