Construction Photos - Week of 05/08/09
Mixing compost for hydroseeding application on seeded areas
Unloading compost material
Hydroseeding at the NW corner of the site
Hydroseeding at the NW corner of the site
View of soil stockpile area north of the site
Application of fabric and EPRO coating on the east BWR Basin wall
View of east BWR Basin wall after membrane liner application
View of east BWR Basin wall after membrane liner application
360° view of site from the pre-oxidation pad on the north end of the site (1 of 10)
360° view of site from the pre-oxidation pad on the north end of the site (2 of 10)
360° view of site from the pre-oxidation pad on the north end of the site (3 of 10)
360° view of site from the pre-oxidation pad on the north end of the site (4 of 10)
360° view of site from the pre-oxidation pad on the north end of the site (5 of 10)
360° view of site from the pre-oxidation pad on the north end of the site (6 of 10)
360° view of site from the pre-oxidation pad on the north end of the site (7 of 10)
360° view of site from the pre-oxidation pad on the north end of the site (8 of 10)
Thumbnail panels:
|
|
|