Construction Photos - Week of 04/03/09

  • Image
    Looking south to the top of the stairs in the Washwater Recovery Pump Station
  • Image
    Looking down to the NE landing down in the lower level of the Washwater Pump Station
  • Image
    NW mid landing looking east down to the NE landing into the lower level of the Pump Station
  • Image
    Damaged lid for electrical manhole vault on the SW corner of entrance to the project site
  • Image
    View of the north side of the Clearwell Building
  • Image
    Backwash supply vertical turbine pump motor
  • Image
    Finished water vertical turbine pump motor
  • Image
    Finished water vertical turbine pump motor
  • Image
    Grading riprap channel on 3:1 hillside on the north end of the site
  • Image
    Placing fill material on 3:1 hillside north of the BWR
Thumbnail panels:
Now Loading

 

 
Home
Water Treatment Plant Phase 1 Construction:   Construction Photos     Daily Construction Logs
Water Treatment Plant Phase 2 Construction:   Construction Photos     Daily Construction Logs
Lagoon:   Construction Photos     Daily Construction Logs