Construction Photos - Week of 03/27/09

  • Image
    View to the east at the north side of the Electrical Room in the Clearwell Building
  • Image
    View of the electrical conduit in the Clearwell Electrical Room
  • Image
    View of the east end of the Clearwell Building (1 of 3)
  • Image
    View of the east end of the Clearwell Building (2 of 3)
  • Image
    View of the east end of the Clearwell Building (3 of 3)
  • Image
    View of the joists in the Clearwell Building
  • Image
    View of the joists in the Clearwell Building
  • Image
    View of the joists in the Clearwell Building
  • Image
    View of the Backwash supply piping in the NW corner of the Clearwell Building
  • Image
    View of the Backwash supply piping in the NW corner of the Clearwell Building
  • Image
    View of the Backwash supply piping in the NW corner of the Clearwell Building
  • Image
    View of the Backwash supply piping in the NW corner of the Clearwell Building
  • Image
    View of the Backwash supply piping in the NW corner of the Clearwell Building
  • Image
    View of a west side 14” pump discharge pipe
  • Image
    View of a west side 14” FCV
  • Image
    View of an east side 14” FCV
  • Image
    View of an east side 14” FCV actuator
  • Image
    View of an east side 14” FCV actuator
  • Image
    View of a west side 14” FCV actuator
  • Image
    View of a west side 14” FCV actuator
  • Image
    View of a west side 14” Finished Water Pump pad
  • Image
    View to the north along with west Finished Water pipeline
  • Image
    View to the north along with west Finished Water pipeline
  • Image
    View of the east side surge relief valve
  • Image
    View of the 24” Finish Water Magmeter
  • Image
    View of the east side FCV’s
  • Image
    The Chloramine Analyzer mounted on the east Clearwell wall
  • Image
    The sample pumps mounted on the east Clearwell wall
  • Image
    Clearwell interior view from the SE corner
  • Image
    Interior view of BWR Basin from the NW corner (1 of 3)
  • Image
    Interior view of BWR Basin from the NW corner (2 of 3)
  • Image
    Interior view of BWR Basin from the NW corner (3 of 3)
  • Image
    View of BWR from the SW corner
  • Image
    BWR stairs and landings
  • Image
    BWR stairs and landings
  • Image
    BWR stairs and landings
  • Image
  • Image
    BWR stairs and landings
  • Image
    BWR stairs and landings
  • Image
    BWR stairs and landings
  • Image
    View of the NE corner of the BWR stairs lowest landing
  • Image
    BWR Sludge Waste Pumps
  • Image
    BWR Water Recycle Pumps
  • Image
    View of the BWR piping on the east wall
  • Image
    Dual Sump Pumps in the lower BWR
  • Image
    View of the BWR stairs
  • Image
    Looking east at the site wastewater drain field
  • Image
    View of the BWR Building
  • Image
    Backfilling in the area on the south side of the Clearwell for the two 24” FW, 2” HDW and piping for future cathodic protection cable installation
  • Image
    Trench for the 2”Ψ HDW on the west side of the door to the Finish Water Pump Station
  • Image
    Basin drain manhole on NW corner of the Clearwell
  • Image
    36” walk pads on the roof of the Clearwell Finished Water Pump Station
  • Image
    Contractor fixed the roof for drainage on the lower half of the roof, off of the SE corner section of Pump #P-6-3-5-#5 Water pump
  • Image
    Caulking to seal under the precast concrete coping and membrane flashing
  • Image
    Setting the manhole ring and caves on the SW corner of the Clearwell (Basin Drain)
  • Image
    Wall on west end of the Clearwell of the Finished Water Pump Station and access to the AS and CS injectors
  • Image
    2”, 3”, Clean out on the HDW (hub drain waste) as shown on sht 2-C-11
  • Image
    Looking north from the south end “T” of the HDW piping going south and west
  • Image
    Access to the bottom of Clearwell Contact Basin west side (center), see sht 4-M-2
  • Image
    Washwater Recovery Basin, NE wall patch work being sealed by “Xypex” seal
  • Image
    Installing the manhole steps at the at the hatch in the NE corner area of the Recovery Basin of the Washwater Recovery Basin
  • Image
    Pressure testing the 2” and 3” HDW piping on the south side of the Finish Water Pump Station
  • Image
    Working on installing the 1” AS and 2” CS piping in the NW corner of the Clearwell Reservoir. See sht 4-M-1, piping to go west.
  • Image
    Working on the 1” and 2” (AS & CS) piping in the NW corner of the Clearwell Reservoir
  • Image
    Covering the 1” and 2” (AS & CS) piping with heat trace and insulate from inside wall down to elev 1983.0±
  • Image
    Installing the manual override wall switch to override thermostat and turn on exhaust fan. Coordinate with Div. 16
  • Image
    Grading for sidewalk area on the south side of the Clearwell Finished Water Pump Station
  • Image
    Backer rod and caulking being installed on the outside of the Clearwell Finished Water Pump Station
  • Image
    Lifting the Filter Backwash Pump #2 to be set in the NW corner of the Clearwell / Finished Water Pump Station
  • Image
    Lifting the Filter Backwash Pump #2 to be set in NW corner of the Clearwell / Finished Water Pump Station
  • Image
    Looking NW across the project site
  • Image
    Looking north from south side of the project west side
  • Image
    Installing the AS and CS lines down into chlorine and ammonia’s solution injections
  • Image
    The chlorine injector (lt side) and two ammonia solution injectors (east side)
  • Image
    Installing piping in the chlorine / ammonia solution injections vault
  • Image
    Working on removing the shoring for temporary floor support for access to the lower Clearwell Pumps area
  • Image
    Pouring 1-1/2” ± flowable non-shrink grout, typ for base on the pump motors, equipment pads ±3005
  • Image
    Chlorine injector and ammonia solution injectors installed into the 48”Ψ FE (DIP) as shown in detail (chemical injector 15800)
  • Image
    Chlorine injector and ammonia solution injectors piping going down the south wall to the 48”Ψ FE (DIP) see detail 15800
  • Image
    Grouting under the pipe supports in the Clearwell Pump Station. See detail 15510
  • Image
    Setting pump (Filter Backwash Pump #2) on the non-shrink grout for support in the NW corner of the Clearwell Pump Station
  • Image
    NW corner area of the site looking east
  • Image
    NW corner area of the site looking southeasterly across the site
  • Image
    Looking SE along the SW corner of the project site
  • Image
    Looking south along the west side of the project line
  • Image
    Looking east along the north side of the NW corner of the project site
  • Image
    Looking NE along the east side of the project storage area
  • Image
    Looking northeasterly from the west side of the project thru the stockpiled (existing) topsoil
  • Image
    On top of the hill on north side of the Clearwell looking west
  • Image
    On top of the hill on north side of the Clearwell looking southwesterly across the site
  • Image
    Looking south from the north side of the project site off the west side of the Clearwell structure
  • Image
    Looking SE past the NE side of the Washwater Recovery Basin / Pump Station
  • Image
    Looking southeasterly between the west side of the Washwater Recovery Basin & east side of the Clearwell Reservoir Water Pump Station
  • Image
    Looking south thru the north side of the Clearwell Reservoir / Finish Water Pump Station
  • Image
    Looking southwesterly off the west side of the Clearwell Reservoir / Water Pump Station
  • Image
    Looking southwesterly thru the contractors staging area
  • Image
    Pipe support grout under the support similar to detail #15510
  • Image
    Bottom of the Clearwell at location of the shoring for patching the main floor area
  • Image
    Removing the shoring out of the lower level of the Clearwell Pump Station
  • Image
    Roof hatch for Filter Backwash Pump #1 in the NW corner area of the Clearwell
  • Image
    Doing cleanup work on the south side of the Clearwell Reservoir / Finished Water Pump Station
  • Image
    Weir gate opening in the west wall center of the Chlorine Contact Basin
  • Image
    West side of the Chlorine Contact Basin at location for weir gate openings looking south to north
Thumbnail panels:
Now Loading

 

 
Home
Water Treatment Plant Phase 1 Construction:   Construction Photos     Daily Construction Logs
Water Treatment Plant Phase 2 Construction:   Construction Photos     Daily Construction Logs
Lagoon:   Construction Photos     Daily Construction Logs