Construction Photos - Week of 03/20/09

  • Image
    Trenching for 24” culvert for new approach to entrance to plant site
  • Image
    Trenching for 24” culvert for new approach to entrance to plant site, trenching north to south
  • Image
    Looking north to south for new 24” culvert crossing at entrance to the project site
  • Image
    Type of material from the existing trench at entrance to project site
  • Image
    Roofing contractor and the masonry contractor working on the roof of the Clearwell Reservoir / Finished Water Pump Station
  • Image
    West 24”Ø FW 90º bend. See shts 4-M-1 and 2-C-11
  • Image
    Pipe drainage on the north most wall in the Clearwell
  • Image
    Grouting the floor section in lower level of the Clearwell Pump Station between columns C & D (north side)
  • Image
    See sht 2-C-4 on new 24ӯ culvert at approach into water treatment plant
  • Image
    Existing underground utilities crossing new 24ӯ CMP at entrance to the water treatment plant
  • Image
    Bedding and backfilling on the 24ӯ CMP at approach to the water treatment plant
  • Image
    Looking SW of the job site from the roof of the Clearwell Finish Water Pump Station
  • Image
    Looking NW of the job site from roof of the Clearwell Finish Water Pump Station
  • Image
    Concrete pad forms at pump locations on the east wall area of the Clearwell Water Pump Station
  • Image
    Trenching for the 24ӯ CMP entrance to the water treatment plant site, looking south
  • Image
    Trenching for an outlet drainage where the new trench will go for future approach
  • Image
    Pouring concrete pads for the future pumps on east side of the Clearwell
  • Image
    Getting outlet trench (temporary) opened to handle the drainage on the west side of the site
  • Image
    Working on the precast concrete coping at NE corner of the Clearwell tie into the corbel
  • Image
    SE corner of the Clearwell Reservoir for the level element, the east 24” FW piping and the suttle access hatch
  • Image
    Working on the sluice gate for the Chlorine and Ammonia Vault on the west end of the Clearwell
  • Image
    Contractor installing the deck shoring for the main floor access to the Clearwell
  • Image
    Getting ready to set shoring for patching the hole in the floor of the Clearwell west center area
  • Image
    Tying rebar mats in the Clearwell floor area, east side of the Chlorine / Ammonia Vault
  • Image
    Working on installing the steps in the Washwater Recovery Basin NW area
  • Image
    Cleaning up the floor area on the east side of the Chlorine / Ammonia Vault
  • Image
    Cleaning the floor area patch on the east side of the Chlorine / Ammonia Vault
  • Image
    Patch for floor area on north side of the electrical room in the Clearwell area
  • Image
    Floor drain in the floor area as shown on sht 4-S-2
  • Image
    Contractor has personnel grinding the floor area in the bottom of Clearwell in area where grout was installed to patch up area where slabwasundercylinderstrengthbreaks
  • Image
    Lifting pump #5 to be set in the Clearwell, SW corner
  • Image
    Swinging SW pump #5 to t he Clearwell SW pump corner
  • Image
    Lowering pump #4 into Clearwell
  • Image
    Lowering pump #4 into the Clearwell
  • Image
    Lowering pump #4 into the Clearwell, west side
  • Image
    Pump #4 west side being lowered thru the hatch
  • Image
    Setting pump #4 on the bolt pattern and grout (non-shrink)
  • Image
    Contractor pouring the floor patch
  • Image
    Contractor pouring the floor patch on the east side of the Ammonia / Chlorine Vault
  • Image
    The floor patch poured on the east side of the Chlorine / Ammonia Vault
Thumbnail panels:
Now Loading

 

 
Home
Water Treatment Plant Phase 1 Construction:   Construction Photos     Daily Construction Logs
Water Treatment Plant Phase 2 Construction:   Construction Photos     Daily Construction Logs
Lagoon:   Construction Photos     Daily Construction Logs