Construction Photos - Week of 03/13/09

  • Image
    Installing the 14” V520 in the Clearwell Finish Water Pump Station
  • Image
    Drying the floor in the lower level of the Clearwell between sections C and D
  • Image
    Unloading a Finish Water Pump for the Clearwell Reservoir
  • Image
    Stockpiling the pumps for the Clearwell east side
  • Image
    Stockpiling the pumps on the top of the Washwater Basin
  • Image
    Getting deck in the bottom of the Clearwell ready to seal with Sika Top #107, between Sections C and D
  • Image
    Mixing the Sika Top Seal 107 for deck in the bottom of the Clearwell
  • Image
    Starting to place the Sika Top Seal 107 for floor in bottom of Clearwell going north to south
  • Image
    Using a squeegee to apply the Sika Top Seal 107 on the concrete floor between columns C and D in Clearwell
  • Image
    Building inside form for the concrete pump support pad in the Clearwell main pump area
  • Image
    Installing the rebar for the equipment pad, not all the rebar set, need one more vertical bar (4) on middle of all sides
  • Image
    Installing piping for the surge bladder tank on south end of Clearwell
  • Image
    Working on applying the Sika Top Seal on the floor of the Clearwell lower level between columns C and D
  • Image
    Adjusting height for the surge bladder tank, SE corner area
  • Image
    Working on installing forms for the concrete pump support pad on the SW corner of pumps area in Clearwell
  • Image
    Material being used to fix the floor area in the bottom of the Clearwell between columns C and D
  • Image
    Material being used in the lower level of the Clearwell bottom area
  • Image
    Material being used in the lower level of the Clearwell bottom area
  • Image
    Third coat of Sika Top Seal 107 in the same area (columns C and D) in the Clearwell lower level
  • Image
    Getting ready to unload the filter Backwash Pump on the Clearwell Contact Basin
  • Image
    Getting ready to unload the filter Backwash Pump on the Clearwell Contact Basin
  • Image
    Filter Backwash Pump being moved to the top of the Clearwell Contact Basin
  • Image
    Setting filter Backwash Pump on the deck (roof) of the Clearwell Contact Basin
Thumbnail panels:
Now Loading

 

 
Home
Water Treatment Plant Phase 1 Construction:   Construction Photos     Daily Construction Logs
Water Treatment Plant Phase 2 Construction:   Construction Photos     Daily Construction Logs
Lagoon:   Construction Photos     Daily Construction Logs