Construction Photos - Week of 03/13/09
Installing the 14” V520 in the Clearwell Finish Water Pump Station
Drying the floor in the lower level of the Clearwell between sections C and D
Unloading a Finish Water Pump for the Clearwell Reservoir
Stockpiling the pumps for the Clearwell east side
Stockpiling the pumps on the top of the Washwater Basin
Getting deck in the bottom of the Clearwell ready to seal with Sika Top #107, between Sections C and D
Mixing the Sika Top Seal 107 for deck in the bottom of the Clearwell
Starting to place the Sika Top Seal 107 for floor in bottom of Clearwell going north to south
Using a squeegee to apply the Sika Top Seal 107 on the concrete floor between columns C and D in Clearwell
Building inside form for the concrete pump support pad in the Clearwell main pump area
Installing the rebar for the equipment pad, not all the rebar set, need one more vertical bar (4) on middle of all sides
Installing piping for the surge bladder tank on south end of Clearwell
Working on applying the Sika Top Seal on the floor of the Clearwell lower level between columns C and D
Adjusting height for the surge bladder tank, SE corner area
Working on installing forms for the concrete pump support pad on the SW corner of pumps area in Clearwell
Material being used to fix the floor area in the bottom of the Clearwell between columns C and D
Material being used in the lower level of the Clearwell bottom area
Material being used in the lower level of the Clearwell bottom area
Third coat of Sika Top Seal 107 in the same area (columns C and D) in the Clearwell lower level
Getting ready to unload the filter Backwash Pump on the Clearwell Contact Basin
Getting ready to unload the filter Backwash Pump on the Clearwell Contact Basin
Filter Backwash Pump being moved to the top of the Clearwell Contact Basin
Setting filter Backwash Pump on the deck (roof) of the Clearwell Contact Basin
Thumbnail panels:
|
|
|