Construction Photos - Week of 02/27/09
Installing the supports under the filter backwash piping in the NW corner of the Clearwell
Looking west to east on the north side of the Clearwell Reservoir / Finished Water Pump Station (filter backwash area)
Electrician installing the electrical bus box at main switch
SE corner of the finished corbel on the Pump Station (Washwater Recovery Basin)
Working in the lower level of the SE corner of the Clearwell
Working in the SW corner of the south Chlorine Contact Basin
Finishing the west end of the precast concrete coping on the Clearwell Finish Water Pump Station
Working on installing the stairs and platforms in the lower level of the Washwater Recovery Basin, setting second landing
Working on installing the stairs and platforms in the lower level of the Washwater Recovery Basin, setting second platform
Bottom of the Washwater Recovery Basin looking up to the second landing in the NW corner
Looking west in the lower level of the stairs in the north wall of the Washwater Recovery Basin
Installing the various sized NPW (3” to ¾”) along the east wall of the lower level of the Washwater Recovery Basin
Looking down at the second and third landings on stairs against the west wall of the lower level Washwater Recovery Basin, looking southtonorth
Looking down the steps to the first landing in the NE corner of the Washwater Recovery Basin