Construction Photos - Week of 02/27/09

  • Image
    Installing the supports under the filter backwash piping in the NW corner of the Clearwell
  • Image
    Looking west to east on the north side of the Clearwell Reservoir / Finished Water Pump Station (filter backwash area)
  • Image
    Electrician installing the electrical bus box at main switch
  • Image
    SE corner of the finished corbel on the Pump Station (Washwater Recovery Basin)
  • Image
    Working in the lower level of the SE corner of the Clearwell
  • Image
    Working in the SW corner of the south Chlorine Contact Basin
  • Image
    Finishing the west end of the precast concrete coping on the Clearwell Finish Water Pump Station
  • Image
    Working on installing the stairs and platforms in the lower level of the Washwater Recovery Basin, setting second landing
  • Image
    Working on installing the stairs and platforms in the lower level of the Washwater Recovery Basin, setting second platform
  • Image
    Bottom of the Washwater Recovery Basin looking up to the second landing in the NW corner
  • Image
    Looking west in the lower level of the stairs in the north wall of the Washwater Recovery Basin
  • Image
    Installing the various sized NPW (3” to ¾”) along the east wall of the lower level of the Washwater Recovery Basin
  • Image
    Looking down at the second and third landings on stairs against the west wall of the lower level Washwater Recovery Basin, looking southtonorth
  • Image
    Looking down the steps to the first landing in the NE corner of the Washwater Recovery Basin
Thumbnail panels:
Now Loading

 

 
Home
Water Treatment Plant Phase 1 Construction:   Construction Photos     Daily Construction Logs
Water Treatment Plant Phase 2 Construction:   Construction Photos     Daily Construction Logs
Careers:   Job Openings