Construction Photos - Week of 02/13/09

  • Image
    Equipment being installed on the north wall of the electrical room
  • Image
    Door and louver removed from SW corner of the electrical room
  • Image
    Contractor setting the precast concrete coping in the NW corner of the Clearwell Finished Pump Station
  • Image
    Welds inside the piping on the east area for the future piping for surge bladder tank
  • Image
    Welds on the outside of the piping on the east area for the surge bladder tank
  • Image
    Flow Control Valve on site
  • Image
    Flow Control valves on site
  • Image
    Working on piping on east side of the Clearwell
  • Image
    Finishing the brick wall on the NW corner of the Clearwell Finished Water Pump Station
  • Image
    Piping set on the main line on the west side of the Clearwell / Finished Water Pump Station, east side, south half
  • Image
    Piping set on the west side of piping on the east half of the Clearwell Water Pump Station
  • Image
    Door and louver removed in the SW corner of the electrical room
  • Image
    Getting ready to weld the outside edge of the tee for the FCV and surge relief valve
  • Image
    Getting ready to weld the outside edge of the tee for the FCU and surge relief valve, looking inside the weld
  • Image
    Electricians crew getting ready to bring one of the electrical SBC-C-1 into electrical room
  • Image
    Moving electrical panel to the inside of electrical room after door and louver removed
  • Image
    Electrical panel set on the north wall of the electrical room on the housekeeping pad
  • Image
    Weld on the tee for the FCU and surge relief valve
  • Image
    The tee welded for the FCV and surge relief east side (SE corner of Clearwell)
  • Image
    Corking in the Chlorine Contact Basin on patching, grinding and cleaning
  • Image
    Getting ready to weld 20”x18” reducer in the Clearwell, west side Water Pump Station
  • Image
    Welding the 20” x 18” reducer in the Clearwell west side Water Pump Station
  • Image
    Getting everything set up for re-doing 20” x 18” reducer on the west piping tee
  • Image
    Getting it lined up for re-doing the reducer on the piping tree
  • Image
    Looking inside the west piping reducing 20” x 18” on water line in Clearwell looking north to soth
  • Image
    Everything lined up to start welding on the west side waterline
  • Image
    One of the welds from the side on the 20” x 18” reducer
  • Image
    Another picture of the weld on the 18” x 20” reducer west side
  • Image
    Welder welding on the 20” x 18” reducer on the west side of the Clearwell east side
  • Image
    Bending rebar for the concrete pads in the electrical room for electrical panels
  • Image
    Cutting rebar for pads in the electrical room
  • Image
    Working on the piping tree at the north end of the east piping tree for the east / west Clearwell Finished Water Pump Station
  • Image
    Holes for the stud anchors on the copings
  • Image
    Forming for equipment housekeeping pads in the electrical room
  • Image
    Middle equipment housekeeping pads in electrical room
  • Image
    Working on north end of the Clearwell Pump Station piping tree
  • Image
    Filling the roof joist opening that were left so the block work could be done first, before the roof?
  • Image
    Filling the roof joist opening that were left so the block work could be done first?
  • Image
    Cutting opening for the FE-6-4 as shown on sht 4-M-1 on the east water line
  • Image
    Tree at the north end of the west and east water line for NPW and PW
  • Image
    Tree at north end of the west and east water line in the Clearwell
  • Image
    Unable to get a better picture, still a picture of the north most tree for NPW and PW (north end of Clearwell)
  • Image
    Rebar in the bottom of the floor above in the lower level of the Clearwell, it appears to be rebar that close, unable to get a good pic
  • Image
    Rebar in the bottom of the floor above in the lower level. Still unable to get a very good picture
  • Image
    Patching around a column in the bottom of Chlorine Contact Basin
  • Image
    Installing the 8” FW piping as shown in section E/4M1, see sht 4-M-4
  • Image
    Installing the precast concrete coping at the NW corner of the Clearwell Finished Water PumpStation
  • Image
    Concrete truck on site with materials for pads for the electrical room
  • Image
    Welding certification personnel on site to certify the contractors welder
  • Image
    Placing concrete pad in the center of the electrical room
  • Image
    Finishing curb in the roof of the Contact Chamber NE corner (roof vent)
  • Image
    Pouring the scuttle hatch in the NE corner of the Contact Chamber
  • Image
    Picture taken from roof over the Contact Chamber (roof vent and scuttle hatch)
  • Image
    On knoll looking SE to the Washwater Recovery Basin
  • Image
    Looking south over the Clearwell Finish Water Pump Station
  • Image
    Looking SW past the west half of the Clearwell Finish Water Pump Station
  • Image
    Looking south westerly by the storage and equipment building (trailers)
  • Image
    Looking west where equipment is being stored on the project site
Thumbnail panels:
Now Loading

 

 
Home
Water Treatment Plant Phase 1 Construction:   Construction Photos     Daily Construction Logs
Water Treatment Plant Phase 2 Construction:   Construction Photos     Daily Construction Logs
Lagoon:   Construction Photos     Daily Construction Logs