Construction Photos - Week of 01/30/09

  • Image
    24” F.W. 90º bend, east side, fixing alignment (south side of Clearwell)
  • Image
    24” F.W. 90º bend, west side, fixing alignment (south side of Clearwell)
  • Image
    24” F.W. 90º bend, west side, going south from Clearwell, south side of structure, fixing alignment
  • Image
    24” F.W. 90º bend, east side, going south from Clearwell, south side of structure, fixing alignment
  • Image
    Working in the Washwater Recover Basin / Pump Station
  • Image
  • Image
    Picture of inside the 24” Ø F.W. piping in the Clearwell south side
  • Image
    Picture of inside the 24” Ø F.W. piping in the Clearwell south side
  • Image
    Epoxy painting the inside wall of the 24” Ø F.W. piping in Clearwell, south side
  • Image
    Block work in the NW corner of the Clearwell / Finish Water Pump Station
  • Image
    Looking at the piping from the bottom of the Clearwell, east side
  • Image
    Looking at the piping from the bottom of the Clearwell, west side
  • Image
    Bottom east side piping going south from the Clearwell
  • Image
    24” Ø F.W. piping being set on the south side of the Clearwell
  • Image
    24” Ø F.W. piping being set on the south side of the Clearwell, west side
  • Image
    Bolting up the 24” Ø F.W. piping being set on the east side of the Clearwell
  • Image
    Block work on the NW corner of the Clearwell Reservoir
  • Image
    Cleaning the flange for the filter backwash floor piping
  • Image
    Looking at floor opening for the two filter backwash pump in the Clearwell Reservoir
  • Image
    Eccentric Reducer on the filter backwash 24” to 20” Ø
  • Image
    West side of the site looking east
  • Image
    West side of the site looking east
  • Image
    West side of the site looking east
  • Image
    Looking west from top of the nob to the north
  • Image
    Looking south west from the nob to the north
  • Image
    Looking south west from the nob
  • Image
    Looking south from the nob Clearwell Reservoir
  • Image
  • Image
    Looking SE from the nob Clearwell Reservoir and Washwater Recovery Basin to the left
  • Image
    Looking east from the north nob thru the Washwater Recovery Basin
  • Image
    Looking south from the east north nob at the Washwater Recovery Basin
  • Image
    From east north nob looking west
  • Image
    From north nob looking south westerly
  • Image
    From east north nob looking south westerly to the south
  • Image
    From east north nob looking south
  • Image
    From east end looking west
  • Image
    From east end looking south west
  • Image
    Looking north east from the middle lagoon dike
  • Image
    Looking north from the middle lagoon dike thru the Washwater Recovery building
  • Image
    Looking NW from middle lagoon dike Washwater Recovery structure to the right and the Clearwell / Finished Water Pump Station
  • Image
    Looking north westerly from middle lagoon theur the Clearwell / Finish Water Pump Station
  • Image
    Looking westerly from the middle lagoon dike to the southwesterly office trailers and storage area
  • Image
    Westerly most dike looking north east along the storage trailers and new structures
  • Image
    Looking north easterly on the south side of the storage trailers and office trailers
  • Image
    Looking north on the south side of the office trailers and storage trailers (west most dike)
  • Image
    North east corner area of the electrical room in the Clearwell Reservoir / Finished Water Pump Station
  • Image
    Panels and electrical MSB and main switch panel on south wall of the electrical room in area “C”
  • Image
    NW corner of the electrical room in the Clearwell Reservoir / Finished Water Pump Station
  • Image
    Panels on south wall of the electrical room looking east to west
  • Image
    Equipment in the upper level of the Clearwell / Finished Water Pump Station, east wall south looking north
  • Image
    From SE corner of the Clearwell / Finished Water Pump Station, looking north westerly
  • Image
    SE corner looking north westerly across the Clearwell / Finished Water Pump Station
  • Image
    Looking west from the SE corner of the Clearwell / Finished Water Pump Station
  • Image
    NE corner of the Clearwell / Finished Water Pump Station looking west
  • Image
    Picture taken from the bottom of the Clearwell, contractor setting piping for filter backwash
  • Image
    Installing the filter backwash piping in the NW corner of the Clearwell
  • Image
  • Image
  • Image
  • Image
Thumbnail panels:
Now Loading

 

 
Home
Water Treatment Plant Phase 1 Construction:   Construction Photos     Daily Construction Logs
Water Treatment Plant Phase 2 Construction:   Construction Photos     Daily Construction Logs
Lagoon:   Construction Photos     Daily Construction Logs