Construction Photos - Week of 01/30/09
24” F.W. 90º bend, east side, fixing alignment (south side of Clearwell)
24” F.W. 90º bend, west side, fixing alignment (south side of Clearwell)
24” F.W. 90º bend, west side, going south from Clearwell, south side of structure, fixing alignment
24” F.W. 90º bend, east side, going south from Clearwell, south side of structure, fixing alignment
Working in the Washwater Recover Basin / Pump Station

Picture of inside the 24” Ø F.W. piping in the Clearwell south side
Picture of inside the 24” Ø F.W. piping in the Clearwell south side
Epoxy painting the inside wall of the 24” Ø F.W. piping in Clearwell, south side
Block work in the NW corner of the Clearwell / Finish Water Pump Station
Looking at the piping from the bottom of the Clearwell, east side
Looking at the piping from the bottom of the Clearwell, west side
Bottom east side piping going south from the Clearwell
24” Ø F.W. piping being set on the south side of the Clearwell
24” Ø F.W. piping being set on the south side of the Clearwell, west side
Bolting up the 24” Ø F.W. piping being set on the east side of the Clearwell
Block work on the NW corner of the Clearwell Reservoir
Cleaning the flange for the filter backwash floor piping
Looking at floor opening for the two filter backwash pump in the Clearwell Reservoir
Eccentric Reducer on the filter backwash 24” to 20” Ø
West side of the site looking east
West side of the site looking east
West side of the site looking east
Looking west from top of the nob to the north
Looking south west from the nob to the north
Looking south west from the nob
Looking south from the nob Clearwell Reservoir

Looking SE from the nob Clearwell Reservoir and Washwater Recovery Basin to the left
Looking east from the north nob thru the Washwater Recovery Basin
Looking south from the east north nob at the Washwater Recovery Basin
From east north nob looking west
From north nob looking south westerly
From east north nob looking south westerly to the south
From east north nob looking south
From east end looking west
From east end looking south west
Looking north east from the middle lagoon dike
Looking north from the middle lagoon dike thru the Washwater Recovery building
Looking NW from middle lagoon dike Washwater Recovery structure to the right and the Clearwell / Finished Water Pump Station
Looking north westerly from middle lagoon theur the Clearwell / Finish Water Pump Station
Looking westerly from the middle lagoon dike to the southwesterly office trailers and storage area
Westerly most dike looking north east along the storage trailers and new structures
Looking north easterly on the south side of the storage trailers and office trailers
Looking north on the south side of the office trailers and storage trailers (west most dike)
North east corner area of the electrical room in the Clearwell Reservoir / Finished Water Pump Station
Panels and electrical MSB and main switch panel on south wall of the electrical room in area “C”
NW corner of the electrical room in the Clearwell Reservoir / Finished Water Pump Station
Panels on south wall of the electrical room looking east to west
Equipment in the upper level of the Clearwell / Finished Water Pump Station, east wall south looking north
From SE corner of the Clearwell / Finished Water Pump Station, looking north westerly
SE corner looking north westerly across the Clearwell / Finished Water Pump Station
Looking west from the SE corner of the Clearwell / Finished Water Pump Station
NE corner of the Clearwell / Finished Water Pump Station looking west
Picture taken from the bottom of the Clearwell, contractor setting piping for filter backwash
Installing the filter backwash piping in the NW corner of the Clearwell